BUILDING A BETTER WORLD

Home

Examples

Panel Deck

Technical

VBuck

Safe Rooms

Training


Home
About PolySteel
Examples
Residential
Commercial
Panel Deck
Technical
VBuck
Safe Rooms
Training
Accessories
Site Map
Contact
Links
Commercial Construction Example
Ace Hardware Store
During Construction:
com8big.gif (68967 bytes)

This Ace Hardware store was originally housed in a 7,000 square foot traditionally built building that averaged $800.00 in heating costs per month. The new 24,000 square foot PolySteel building's average heating cost per month is $390.00!
Finished Product:
com9big.gif (65871 bytes)


Please report problems to john@polysteelnortheast.com © Polysteel Northeast, LLC 2000. All Rights Reserved.
No part of this website may be reproduced or used without express and written permission from the owner.
Polysteel® and Polysteel Form® are registered trademarks of American Polysteel Forms.